/
Unable to view actions in Activity Node

Unable to view actions in Activity Node

Problem

I observe that when a new step (any Action) is added to an Activity Node which is already enclosing some actions, the latest step is not visible. In addition, it is not visible even after resizing the activity node screen (refer below figures).


Background

  1. The model must enclose at least one Activity Node.

  2. The Activity Node must enclose in-prior minimum 3-4 actions.

Solution

This issue can be solved by following below steps:

  1. Go to Display Settings and consider Scale and Layout section

 

2. Change the first dropdown (“Change the size of text, apps, and other items”) to 125%

3. Close and restart the Creator and the issue will be resolved.

Key Concept

Scaling: Such issues are found in the conditions when the display scaling has been modified or has not been set to the value which is of need. This kind of issue generally appears with laptops which have lot of new resolution options and other settings, and a default setting different from our recommendation.


Related content

Combinatorial Actions - Introduction
Combinatorial Actions - Introduction
More like this
Use Action Results Instead of Variable Data Objects
Use Action Results Instead of Variable Data Objects
More like this
Structure Functionality using Multiple Activity Diagrams
Structure Functionality using Multiple Activity Diagrams
More like this
Merge Nodes and Finalized Runs
Merge Nodes and Finalized Runs
More like this
Minimize (Direct) Use of Custom Actions
Minimize (Direct) Use of Custom Actions
More like this
Run Clean Diagrams
Run Clean Diagrams
More like this

Copyright © 2023 Conformiq and its subsidiaries. All rights reserved.